Turbine Equipment Configurations
Home / Turbine Equipment Configurations
Turbine Equipment Configurations
MCCS/VRA-I SKID
Mobile Compressor Cleaning Skid
- Portable
- Tank Capacity 200 – 700 Liters
- 50 or 60 Hz Operation
- Hose Connection to the Gas Turbine
- Connection with Cam Locking Couplings
ACCS-E / VRA-III E GAS TURBINE COMPRESSOR CLEANING SYSTEM COMPACT
- Self-supporting tank construction, content 1.000 L, Material: stainless steel
- Pipeline with Fittings and Circulation Circuit
- Pressure Sensors
- Control cabinet with SPS
- Feed Pump for Cleaning Mixture
ACCS/VRA-III SKID
Advanced Compressor Cleaning System
- Stationary, fully automatic unit
- Compressor Cleaning Down to -35℃ Air Intake Temperature
- This System Can Supply Up to 6 Gas Turbines
- Max. 75m Pipeline Length Between ACCS/VRA-III and Gas Turbine
ACCS/VRA-III CONTROL
Advanced Compressor Cleaning System
- Exchange of Signals Between ACCS/VRA-III and Plant Control
- The Plant Control Starts the Cleaning Process
- The Cleaning Fluid is Prepared in the Mixing Tank
- Cleaning fluid is Mixed With Demineralized Water, Siwash S, and Si-Antifreeze if Required
- After This Step, the Plant Control Has to Start the Injection of the Cleaning Fluid
- When Cleaning is Complete, the Piping System is Blown Out By Compressed Air
- As Process Control a SIMATIC S7-300 or a VIPA 300S