Turbine Equipment Configurations

Home / Turbine Equipment Configurations

Turbine Equipment Configurations


MCCS/VRA-I SKID

Mobile Compressor Cleaning Skid

  • Portable
  • Tank Capacity 200 – 700 Liters
  • 50 or 60 Hz Operation
  • Hose Connection to the Gas Turbine
  • Connection with Cam Locking Couplings

ACCS-E / VRA-III E GAS TURBINE COMPRESSOR CLEANING SYSTEM COMPACT

  • Self-supporting tank construction, content 1.000 L, Material: stainless steel
  • Pipeline with Fittings and Circulation Circuit
  • Pressure Sensors
  • Control cabinet with SPS
  • Feed Pump for Cleaning Mixture

ACCS/VRA-III SKID

Advanced Compressor Cleaning System

  • Stationary, fully automatic unit
  • Compressor Cleaning Down to -35℃ Air Intake Temperature
  • This System Can Supply Up to 6 Gas Turbines
  • Max. 75m Pipeline Length Between ACCS/VRA-III and Gas Turbine

ACCS/VRA-III CONTROL
Advanced Compressor Cleaning System

  • Exchange of Signals Between ACCS/VRA-III and Plant Control
  • The Plant Control Starts the Cleaning Process
  • The Cleaning Fluid is Prepared in the Mixing Tank
  • Cleaning fluid is Mixed With Demineralized Water, Siwash S, and Si-Antifreeze if Required
  • After This Step, the Plant Control Has to Start the Injection of the Cleaning Fluid
  • When Cleaning is Complete, the Piping System is Blown Out By Compressed Air
  • As Process Control a SIMATIC S7-300 or a VIPA 300S